Load an execution plan manually

Use this procedure to specify which historical data to load when an execution plan is run.

  1. On the Execution plans tab, select the project and plan for which you will set data loading preferences.
  2. In the Loading column, click Load.

    Note The settings are modified and applied only to the highlighted plan, rather than all plans with check boxes selected.

  3. In the Date range section, define the date range for the historical data to load.
    1. In the From date section, select the starting date. If you select Specific date, use the calendar control to set the date and time.
    2. In the To date section, select the ending date. If you select Specific date, use the calendar control to set the date and time.
    3. Select the Last successful load date to load the data consecutively, without any time gaps.
    4. Select Save "To date" as the date of last successful load if required.
  4. Click Load data.

    As the data is loaded, a Loading progress indicator appears in the Log management section, where related events are listed.

  5. Use the following functions to manage the Log management list:
    • Refresh: Refreshes the list manually.

    • Auto-refresh: Refreshes the list automatically.

    • Clear: Removes the currently listed items.