Load an execution plan manually
Use this procedure to specify which historical data to load when an execution plan is run.
- On the Execution plans tab, select the project and plan for which you will set data loading preferences.
-
In the
Loading column, click
Load.
Note The settings are modified and applied only to the highlighted plan, rather than all plans with check boxes selected.
-
In the
Date range section,
define the date range for the historical data to load.
- In the From date section, select the starting date. If you select Specific date, use the calendar control to set the date and time.
- In the To date section, select the ending date. If you select Specific date, use the calendar control to set the date and time.
- Select the Last successful load date to load the data consecutively, without any time gaps.
- Select Save "To date" as the date of last successful load if required.
-
Click
Load data.
As the data is loaded, a Loading progress indicator appears in the Log management section, where related events are listed.
-
Use the following functions to manage the
Log management
list:-
Refresh: Refreshes the list manually.
-
Auto-refresh: Refreshes the list automatically.
-
Clear: Removes the currently listed items.
-