Remove date
You can select data for specified dates to exclude from data load operations. If you remove the date, the next data load is executed according to the following rules:
-
If the plan is scheduled with the time interval setting, the starting date is defined as one interval backwards.
-
If the plan is scheduled with the Every day, at specific times time setting, the starting date is defined as 24 hours backwards.
-
If the plan has no scheduling, the starting date is defined as the beginning of the current day.
- Select the History dates tab.
-
On the
Actions toolbar, click
Remove
.