The Production task dialog: Activities selection settings

ClosedTo access this dialog:

  1. On the Configuration tab of the Administration module, select Solutions and expand a solution.

  2. Select Production tasks.

  3. In the right pane, double-click a production task.

  4. Select Activities > Selection.

Use these settings to select which activities to run in a production task.

Activities

Input

Includes the Input activity.

Enhance

Includes the Enhance activity.

Sort

Includes the Sort activity.

Note: If Inspect is the first activity in a production task, Automatic sort is available. This option automatically sorts documents between Inspect's manual operations. Selecting this option adds the text "(Selected from Inspect)" to the Sort folder. This allows you to configure the Sort > Classify settings even though the Sort activity is not selected in this dialog.

Inspect

Includes the Inspect activity.

Extract

Includes the Extract activity.

Verify

Includes the Verify activity.

Output

Includes the Output activity.

Select all

Selects all activities.

Deselect all

Deselects all activities.