Add resources for simulation
When you add a resource to a simulation, the productivity set for the simulation overrides the productivity of the resource. If a resource or resource group is unavailable for taking up tasks for a certain period of time, for example, when a resource is on leave, you can define unavailability schedules for that resource or resource group in the simulator.
- On the Simulation page, consume the resources or groups to use.
- Select the resource or group.
-
In the
Properties panel, click
Settings
The Extended Properties page appears.
- In the Productivity box, enter or select a productivity value for this resource.
-
To schedule times when the resource is unavailable, in the
Schedule group configure
the following:
- In the Start Time box, enter or select the date and time from when the resource will be unavailable.
-
In the
Duration box, enter
the duration for which the resource will be unavailable.
The start time and duration for the unavailability schedule must be within the simulation duration.
-
Click
Add
.
- Configure more schedules if the resource is going to be unavailable for multiple periods of time.