Run an Ad Hoc rule
Perform this topic to use a schedule to run an ad hoc rule.
-
On the Tasks tab (New/Edit Schedule dialog box) of the Schedule Manager dialog box, click .
This opens the New/Edit Task (Perform Rule) dialog box.
- Enter a Name and Description for the task.
-
In the Choose the rule to perform list, select an existing ad hoc rule.
To create a rule, click the browse button (...) and create a rule from the Ad Hoc Rules Manager dialog box. See Working with ad hoc rules for instructions on creating rules.
-
In the Run mode list, choose if you want to run the rule against all documents
in the spool or against all newly received documents since the last time
the rule was run.
The rule will not be run against retained documents.
- Once the task is selected, click OK.
The new task is listed in the grid on the Tasks tab.